BENCH AND PILOT TREATABILITY EXPERIENCE
EE&T
is a full service consulting firm that is known for its particular
expertise in the area of conducting bench- and pilot-scale treatability
studies. Our knowledge of scale down techniques comes from a strong
background in process design by the firm's managers. EE&T's
President, Dr. David Cornwell, P.E., was instrumental in the development
of scale up/down to accurately define water plant conditions through
simulation research. This work has been fundamental to much of the basic
bench-scale work being undertaken today.

Since EE&T's inception in 1985, it has designed and conducted numerous
bench and pilot studies. That work has steadily increased over the past
17 years and now totals 92 projects in all. EE&T recently completed
the design and construction of a $1.2 million permanent pilot facility
for ECWA in New York. EE&T's treatability work over that time has
been fairly evenly split between bench and pilot projects.
EE&T
has extensive experience in designing and operating advanced treatment
pilot plants. We have been selected from a field of other nationally
known firms to design and operate advanced pilot plants throughout the
U.S. For example, we have designed ozone/BAC/GAC pilot plants for Tulsa,
OK; Erie County Water Authority, NY; Appomattox River Water Authority,
VA; Washington, NC; Marine Corps Air Station-Cherry Point, NC; and
Durham, NC. All of these projects have resulted in significant
contributions to treatment, or resulted in design criteria for new
processes.

EE&T
has developed a specialist reputation over the years because of our
experience in operating advanced pilot plants that include ozone, BAC,
GAC, membranes, and high rate processes including DAF. Our
firm has the equivalent of nearly 100 months or 8 years of experience in
running GAC pilot studies, and just under 8 years of experience running
ozone pilot projects. We also have the equivalent of 1 year of operating
experience in conducting membrane and dissolved air flotation pilot
investigations. EE&T also has vast experience in the operation of
conventional pilot-scale projects. That experience includes 100 months
of conventional pilot plant operation and 80 months of filter
media evaluations. Our firm has also conducted pilot plant
evaluations of several high rate processes, including tube settlers,
plate settlers, and the Microfloc Trident process. Our
combined high rate pilot plant operating experience equals more than 30
months of operation. EE&T's cumulative total experience in running
conventional pilot-scale projects is about 19 years.
We
have a proven track record for completing bench and pilot studies in an
expeditious and cost-effective manner. A key factor contributing to our
firm's success in conducting treatability studies is our on-site
analytical laboratory which is one of the few facilities in the nation
that was certified to conduct TOC and DBP analyses under the ICR. The
excellent working relationship between our process and laboratory groups
ensures that treatability analyses are done quickly and that the
laboratory staff frequently interacts with the individuals conducting
treatability work.
|